Automation index
How much of a Production engineer’s job can AI already do?
An OEE and a sequencer come earlier. Getting the shift out without stopping the line for nothing do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Production engineer
25%
AI can already do 25% of this job.
#233 / 633
View rankingProduction engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
OEE, sequence and the shift plan.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Line, changeovers and the micro-stop.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Layout, times and the work standard.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Supervisors, unions and the shift that turns.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
In-line quality and the batch that cannot ship.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Hit the plan, and not dressing the OEE.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- OEE
- sequence production
- changeovers
- layout
- work standards
- micro-stops
- shift plan
- in-line quality
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Foley artist
22%
#322 / 633
View rankingFoley artist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
List, picture and the point.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Footstep, cloth and the hit.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Stage, mics and the one that eats the dialogue.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Mix, the editor and the one that misses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The director, the taste and not loading extra steps.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it sounds true, and not covering the voice.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- footsteps
- cloth
- hits
- foley stage
- picture
- mics
- the mix
- effects lists
Sources for this job· O*NET 27-4014.00· ESCO/ISCO 3521