Automation index
How much of a Production engineer’s job can AI already do?
An OEE and a sequencer come earlier. Getting the shift out without stopping the line for nothing do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Production engineer
25%
AI can already do 25% of this job.
#248 / 683
View rankingProduction engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
OEE, sequence and the shift plan.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Line, changeovers and the micro-stop.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Layout, times and the work standard.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Supervisors, unions and the shift that turns.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
In-line quality and the batch that cannot ship.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Hit the plan, and not dressing the OEE.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- OEE
- sequence production
- changeovers
- layout
- work standards
- micro-stops
- shift plan
- in-line quality
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Heritage interpreter
22%
#365 / 683
View rankingHeritage interpreter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Script, the group and the time.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Room, the question and the one who will not listen.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
The piece, the context and not making it up.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
School group, the yard and getting them to touch carefully.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The director, capacity and not overcrowding.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That they look at the stone, and not just the phone.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tour scripts
- school groups
- pieces
- historical context
- capacity
- not make it up
- heritage
- guided visits
Sources for this job· O*NET 25-4012.00· ESCO/ISCO 2621