IS WORK OVER?

Automation index

How much of a Production engineer’s job can AI already do?

An OEE and a sequencer come earlier. Getting the shift out without stopping the line for nothing do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Production engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
OEE, sequence and the shift plan.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Line, changeovers and the micro-stop.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Layout, times and the work standard.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Supervisors, unions and the shift that turns.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
In-line quality and the batch that cannot ship.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Hit the plan, and not dressing the OEE.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • OEE
  • sequence production
  • changeovers
  • layout
  • work standards
  • micro-stops
  • shift plan
  • in-line quality

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

HVAC engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Loads, flows and the plant.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Works, the duct and the one they crushed.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Commissioning, the balance and the room that sweats.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Noise, the grille and not leaving the whistle.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the saving and not killing the fresh air.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it does not sweat, and not oversizing.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • load calcs
  • air flows
  • ducts
  • balancing
  • grilles
  • fresh air
  • whistles
  • HVAC plant

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 269Biomedical engineer25%
  2. 270Civil engineer25%
  3. 271Petroleum engineer25%
  4. 273Robotics engineer25%
  5. 274Telecom engineer25%
  6. 275Electrical engineer25%