IS WORK OVER?

Automation index

How much of a Production engineer’s job can AI already do?

An OEE and a sequencer come earlier. Getting the shift out without stopping the line for nothing do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Production engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
OEE, sequence and the shift plan.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Line, changeovers and the micro-stop.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Layout, times and the work standard.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Supervisors, unions and the shift that turns.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
In-line quality and the batch that cannot ship.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Hit the plan, and not dressing the OEE.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • OEE
  • sequence production
  • changeovers
  • layout
  • work standards
  • micro-stops
  • shift plan
  • in-line quality

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Language assistant

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Sheet, the oral and the group.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Classroom, the silence and the one who will not speak.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Game, the mistake and not correcting every one.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Culture, the cliché and not playing the clown.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The teacher, the hour and not leaving them copying.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That they speak, and not laughing at the accent.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • orals
  • conversation sheets
  • language games
  • accent
  • culture
  • not correct every error
  • language assistant
  • groups

Sources for this job· O*NET 25-3099.00· ESCO/ISCO 2353

Analyse my job

Jobs with similar scores

  1. 246Biomedical engineer25%
  2. 247Civil engineer25%
  3. 248Petroleum engineer25%
  4. 250Robotics engineer25%
  5. 251Telecom engineer25%
  6. 252Electrical engineer25%