Automation index
How much of a Production engineer’s job can AI already do?
An OEE and a sequencer come earlier. Getting the shift out without stopping the line for nothing do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Production engineer
25%
AI can already do 25% of this job.
#233 / 633
View rankingProduction engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
OEE, sequence and the shift plan.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Line, changeovers and the micro-stop.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Layout, times and the work standard.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Supervisors, unions and the shift that turns.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
In-line quality and the batch that cannot ship.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Hit the plan, and not dressing the OEE.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- OEE
- sequence production
- changeovers
- layout
- work standards
- micro-stops
- shift plan
- in-line quality
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Lathe operator
26%
#214 / 633
View rankingLathe operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read the drawing, tolerances and the route card.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Set up, clamp, pick the tool and the origin.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Turn, face, thread and finish the part.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 28% | +5 |
Measure, tweak offsets and not scrap the batch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Lathe care, swarf and safety.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Grades, times and liability for the dimension.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- turn parts
- set up the lathe
- measure dimensions
- cut threads
- adjust offsets
- read mechanical drawings
- avoid scrap
- pick tools
Sources for this job· O*NET 51-4034.00· ESCO/ISCO 7223