IS WORK OVER?

Automation index

How much of a Production engineer’s job can AI already do?

An OEE and a sequencer come earlier. Getting the shift out without stopping the line for nothing do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Production engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
OEE, sequence and the shift plan.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Line, changeovers and the micro-stop.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Layout, times and the work standard.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Supervisors, unions and the shift that turns.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
In-line quality and the batch that cannot ship.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Hit the plan, and not dressing the OEE.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • OEE
  • sequence production
  • changeovers
  • layout
  • work standards
  • micro-stops
  • shift plan
  • in-line quality

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Montessori teacher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Environment, the material and the order.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Presentation, the tray and not doing it for them.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Observe, the note and not interrupting.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Conflict, the boundary and not lecturing.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The family, the wait and not selling magic.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Not interrupting the one who is working.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • prepared environment
  • Montessori material
  • presentations
  • observation
  • trays
  • not interrupt
  • not lecture
  • classroom order

Sources for this job· O*NET 25-2011.00· ESCO/ISCO 2342

Analyse my job

Jobs with similar scores

  1. 246Biomedical engineer25%
  2. 247Civil engineer25%
  3. 248Petroleum engineer25%
  4. 250Robotics engineer25%
  5. 251Telecom engineer25%
  6. 252Electrical engineer25%