Automation index
How much of a Production engineer’s job can AI already do?
An OEE and a sequencer come earlier. Getting the shift out without stopping the line for nothing do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Production engineer
25%
AI can already do 25% of this job.
#233 / 633
View rankingProduction engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
OEE, sequence and the shift plan.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Line, changeovers and the micro-stop.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Layout, times and the work standard.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Supervisors, unions and the shift that turns.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
In-line quality and the batch that cannot ship.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Hit the plan, and not dressing the OEE.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- OEE
- sequence production
- changeovers
- layout
- work standards
- micro-stops
- shift plan
- in-line quality
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
NGO programme officer
26%
#213 / 633
View rankingNGO programme officer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Design, indicators and the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 48% | +7.7 |
Justify, invoices and the donor.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Field or neighbourhood and what does not fit the frame.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Partners, meetings and coordination.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The surprise, the cut and redoing the timetable.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it works, and not inflating the indicator.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- design projects
- justify to donors
- indicators
- activity report
- coordinate partners
- timetable
- project invoices
- neighbourhood work
Sources for this job· O*NET 21-1093.00· ESCO/ISCO 2635