Automation index
How much of a Production engineer’s job can AI already do?
An OEE and a sequencer come earlier. Getting the shift out without stopping the line for nothing do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Production engineer
25%
AI can already do 25% of this job.
#233 / 633
View rankingProduction engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
OEE, sequence and the shift plan.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Line, changeovers and the micro-stop.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Layout, times and the work standard.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Supervisors, unions and the shift that turns.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
In-line quality and the batch that cannot ship.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Hit the plan, and not dressing the OEE.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- OEE
- sequence production
- changeovers
- layout
- work standards
- micro-stops
- shift plan
- in-line quality
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Osteopath
20%
#460 / 633
View rankingOsteopath
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
History, tests and a first plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Manipulation, mobilisation and visceral work.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Explain, dose and refer if there is a red flag.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Clinical notes and progress.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Room, hygiene and informed consent.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
The practitioner’s body and not doing harm.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- History, tests and a first plan
- Clinical notes and progress
- Room, hygiene and informed consent
- The practitioner’s body and not doing harm
- osteopata
- osteopath
Sources for this job· O*NET 29-1299.00· ESCO/ISCO 2269