Automation index
How much of a Production engineer’s job can AI already do?
An OEE and a sequencer come earlier. Getting the shift out without stopping the line for nothing do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Production engineer
25%
AI can already do 25% of this job.
#233 / 623
View rankingProduction engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
OEE, sequence and the shift plan.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Line, changeovers and the micro-stop.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Layout, times and the work standard.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Supervisors, unions and the shift that turns.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
In-line quality and the batch that cannot ship.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Hit the plan, and not dressing the OEE.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- OEE
- sequence production
- changeovers
- layout
- work standards
- micro-stops
- shift plan
- in-line quality
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Perfusionist
20%
#457 / 623
View rankingPerfusionist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Build the circuit, prime and the checklist.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Run the pump, gases and temperature.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Cardioplegia, haemofiltration and weaning.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
ECMO, emergencies and the oxygenator change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Logs, alarms and talk to the surgeon.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
No air in the line and owning the machine.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- run the pump
- CPB
- prime the circuit
- cardioplegia
- ECMO
- wean off pump
- oxygenator
- perfusion
Sources for this job· O*NET 29-2099.00· ESCO/ISCO 3212