IS WORK OVER?

Automation index

How much of a Production engineer’s job can AI already do?

An OEE and a sequencer come earlier. Getting the shift out without stopping the line for nothing do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Production engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
OEE, sequence and the shift plan.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Line, changeovers and the micro-stop.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Layout, times and the work standard.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Supervisors, unions and the shift that turns.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
In-line quality and the batch that cannot ship.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Hit the plan, and not dressing the OEE.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • OEE
  • sequence production
  • changeovers
  • layout
  • work standards
  • micro-stops
  • shift plan
  • in-line quality

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Pesticide applicator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Log, product and the dose.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Apply, drift and the wind that gets up.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
The withholding period and the one who wants in now.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
PPE, the container and the collection point.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The neighbour, the bees and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Not taking the river, and signing the treatment.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • farm log
  • pesticide dose
  • drift
  • withholding period
  • PPE
  • empty containers
  • bees
  • field wind

Sources for this job· O*NET 37-3012.00· ESCO/ISCO 6113

Analyse my job

Jobs with similar scores

  1. 230Biomedical engineer25%
  2. 231Civil engineer25%
  3. 232Petroleum engineer25%
  4. 234Robotics engineer25%
  5. 235Telecom engineer25%
  6. 236Electrical engineer25%