IS WORK OVER?

Automation index

How much of a Production engineer’s job can AI already do?

An OEE and a sequencer come earlier. Getting the shift out without stopping the line for nothing do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Production engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
OEE, sequence and the shift plan.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Line, changeovers and the micro-stop.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Layout, times and the work standard.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Supervisors, unions and the shift that turns.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
In-line quality and the batch that cannot ship.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Hit the plan, and not dressing the OEE.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • OEE
  • sequence production
  • changeovers
  • layout
  • work standards
  • micro-stops
  • shift plan
  • in-line quality

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Pharmacy technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Counts, orders and expiry dates.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Dispense, prepare and label.
Estimate

No public source provides a precise figure. This is our estimate.

20%12%+2.4
Counter service and basic dosing.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Compounds, repack and records.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Pharmacy on-call and emergency stock.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Not mixing up a drug or a patient.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%23%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Counts, orders and expiry dates
  • Dispense, prepare and label
  • Counter service and basic dosing
  • Compounds, repack and records
  • Pharmacy on-call and emergency stock
  • Not mixing up a drug or a patient
  • tecnico de farmacia
  • auxiliar de farmacia
  • pharmacy technician

Sources for this job· O*NET 29-2052.00· ESCO/ISCO 3213

Analyse my job

Jobs with similar scores

  1. 230Biomedical engineer25%
  2. 231Civil engineer25%
  3. 232Petroleum engineer25%
  4. 234Robotics engineer25%
  5. 235Telecom engineer25%
  6. 236Electrical engineer25%