Automation index
How much of a Production engineer’s job can AI already do?
An OEE and a sequencer come earlier. Getting the shift out without stopping the line for nothing do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Production engineer
25%
AI can already do 25% of this job.
#233 / 633
View rankingProduction engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
OEE, sequence and the shift plan.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Line, changeovers and the micro-stop.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Layout, times and the work standard.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Supervisors, unions and the shift that turns.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
In-line quality and the batch that cannot ship.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Hit the plan, and not dressing the OEE.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- OEE
- sequence production
- changeovers
- layout
- work standards
- micro-stops
- shift plan
- in-line quality
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Property valuer
24%
#280 / 633
View rankingProperty valuer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Comps, cadastre and a first value.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Visit, measurements and defects.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Report, photos and bank annexes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Client, lender and valuation deadlines.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Valuation rules and liability.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not signing a flat that is not worth that.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Comps, cadastre and a first value
- Visit, measurements and defects
- Report, photos and bank annexes
- Client, lender and valuation deadlines
- Valuation rules and liability
- Not signing a flat that is not worth that
- tasador inmobiliario
- tasador
- property valuer
Sources for this job· O*NET 13-2023.00· ESCO/ISCO 3315