IS WORK OVER?

Automation index

How much of a Production engineer’s job can AI already do?

An OEE and a sequencer come earlier. Getting the shift out without stopping the line for nothing do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Production engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
OEE, sequence and the shift plan.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Line, changeovers and the micro-stop.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Layout, times and the work standard.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Supervisors, unions and the shift that turns.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
In-line quality and the batch that cannot ship.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Hit the plan, and not dressing the OEE.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • OEE
  • sequence production
  • changeovers
  • layout
  • work standards
  • micro-stops
  • shift plan
  • in-line quality

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Reliability engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Data, MTBF and the Pareto.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Failure, the cause and not patching twice.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Spare, the critical and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
RCM, the plan and the one that is not done.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Production, the rush and not running the tired one.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it does not drop at three, and not hiding the spare.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • MTBF
  • Pareto
  • root causes
  • critical spares
  • RCM
  • failures
  • maintenance plans
  • not patch twice

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Analyse my job

Jobs with similar scores

  1. 264Biomedical engineer25%
  2. 265Civil engineer25%
  3. 266Petroleum engineer25%
  4. 268Robotics engineer25%
  5. 269Telecom engineer25%
  6. 270Electrical engineer25%