IS WORK OVER?

Automation index

How much of a Production engineer’s job can AI already do?

An OEE and a sequencer come earlier. Getting the shift out without stopping the line for nothing do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Production engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
OEE, sequence and the shift plan.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Line, changeovers and the micro-stop.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Layout, times and the work standard.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Supervisors, unions and the shift that turns.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
In-line quality and the batch that cannot ship.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Hit the plan, and not dressing the OEE.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • OEE
  • sequence production
  • changeovers
  • layout
  • work standards
  • micro-stops
  • shift plan
  • in-line quality

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Research scientist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Literature review, figures and drafts.
Estimate

No public source provides a precise figure. This is our estimate.

22%48%+10.6
Analysis, code and experiment boards.
Estimate

No public source provides a precise figure. This is our estimate.

18%42%+7.6
Design the study and the controls.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Run the experiment or the fieldwork.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Lead a group, theses and authorship fights.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Win funding and answer reviewers.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Literature review, figures and drafts
  • Analysis, code and experiment boards
  • Design the study and the controls
  • Run the experiment or the fieldwork
  • Lead a group, theses and authorship fights
  • Win funding and answer reviewers
  • cientifico
  • investigador
  • research scientist

Sources for this job· O*NET 19-1029.00· ESCO/ISCO 2131

Analyse my job

Jobs with similar scores

  1. 230Biomedical engineer25%
  2. 231Civil engineer25%
  3. 232Petroleum engineer25%
  4. 234Robotics engineer25%
  5. 235Telecom engineer25%
  6. 236Electrical engineer25%