Automation index
How much of a Production engineer’s job can AI already do?
An OEE and a sequencer come earlier. Getting the shift out without stopping the line for nothing do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Production engineer
25%
AI can already do 25% of this job.
#233 / 623
View rankingProduction engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
OEE, sequence and the shift plan.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Line, changeovers and the micro-stop.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Layout, times and the work standard.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Supervisors, unions and the shift that turns.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
In-line quality and the batch that cannot ship.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Hit the plan, and not dressing the OEE.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- OEE
- sequence production
- changeovers
- layout
- work standards
- micro-stops
- shift plan
- in-line quality
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Route planner
28%
#112 / 623
View rankingRoute planner
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Optimise, windows and capacity.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Restrictions, tolls and the right vehicle.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
The salesperson who promises and the plan that will not.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Recalc, incidents and the next day.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The warehouse, the cut-off and not leaving the last one.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it fits, and not blowing the hours.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- optimise routes
- delivery windows
- tolls
- vehicle capacity
- recalc
- traffic restrictions
- warehouse cut-off
- driving hours
Sources for this job· O*NET 13-1081.00· ESCO/ISCO 4323