Automation index
How much of a Production engineer’s job can AI already do?
An OEE and a sequencer come earlier. Getting the shift out without stopping the line for nothing do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Production engineer
25%
AI can already do 25% of this job.
#269 / 743
View rankingProduction engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
OEE, sequence and the shift plan.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Line, changeovers and the micro-stop.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Layout, times and the work standard.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Supervisors, unions and the shift that turns.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
In-line quality and the batch that cannot ship.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Hit the plan, and not dressing the OEE.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- OEE
- sequence production
- changeovers
- layout
- work standards
- micro-stops
- shift plan
- in-line quality
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
SCADA technician
22%
#480 / 743
View rankingSCADA technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Screen, tags and the alarm.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the PLC and the one that will not answer.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Historian, the gap and not dressing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Network, the port and not leaving it open.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The shift, the doubt and not hiding the alarm.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That they see the alarm, and not dressing the historian.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- SCADA screens
- alarms
- historian
- tags
- ports
- field PLC
- not leave ports open
- shifts
Sources for this job· O*NET 15-1244.00· ESCO/ISCO 3114