IS WORK OVER?

Automation index

How much of a Production engineer’s job can AI already do?

An OEE and a sequencer come earlier. Getting the shift out without stopping the line for nothing do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Production engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
OEE, sequence and the shift plan.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Line, changeovers and the micro-stop.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Layout, times and the work standard.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Supervisors, unions and the shift that turns.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
In-line quality and the batch that cannot ship.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Hit the plan, and not dressing the OEE.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • OEE
  • sequence production
  • changeovers
  • layout
  • work standards
  • micro-stops
  • shift plan
  • in-line quality

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Science teacher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Practical, the protocol and the kit.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Lab, the bunsen and the one who will not read.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Data, the graph and not inventing the point.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Exam, the formula and getting them to explain.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The damage, the note and not leaving the acid open.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That they do not burn, and understand what they measured.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • lab practicals
  • bunsen
  • science protocols
  • graphs
  • formulae
  • acid
  • incident notes
  • lab safety

Sources for this job· O*NET 25-2031.00· ESCO/ISCO 2330

Analyse my job

Jobs with similar scores

  1. 240Biomedical engineer25%
  2. 241Civil engineer25%
  3. 242Petroleum engineer25%
  4. 244Robotics engineer25%
  5. 245Telecom engineer25%
  6. 246Electrical engineer25%