Automation index
How much of a Production engineer’s job can AI already do?
An OEE and a sequencer come earlier. Getting the shift out without stopping the line for nothing do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Production engineer
25%
AI can already do 25% of this job.
#233 / 623
View rankingProduction engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
OEE, sequence and the shift plan.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Line, changeovers and the micro-stop.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Layout, times and the work standard.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Supervisors, unions and the shift that turns.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
In-line quality and the batch that cannot ship.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Hit the plan, and not dressing the OEE.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- OEE
- sequence production
- changeovers
- layout
- work standards
- micro-stops
- shift plan
- in-line quality
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Soldier
14%
#618 / 623
View rankingSoldier
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Logs, written orders and paper logistics.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Classroom drill and simulators.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Physical drill, weapons and field.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 6% | +1.3 |
Operations, watch and deployment.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 8% | +1.4 |
Unit life, discipline and comrades.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 10% | +1.6 |
Command or be commanded in a real incident.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 14% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Logs, written orders and paper logistics
- Classroom drill and simulators
- Physical drill, weapons and field
- Operations, watch and deployment
- Unit life, discipline and comrades
- Command or be commanded in a real incident
- militar
- soldado
- soldier
- ejercito
Sources for this job· O*NET 55-1011.00· ESCO/ISCO 0110