IS WORK OVER?

Automation index

How much of a Production engineer’s job can AI already do?

An OEE and a sequencer come earlier. Getting the shift out without stopping the line for nothing do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Production engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
OEE, sequence and the shift plan.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Line, changeovers and the micro-stop.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Layout, times and the work standard.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Supervisors, unions and the shift that turns.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
In-line quality and the batch that cannot ship.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Hit the plan, and not dressing the OEE.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • OEE
  • sequence production
  • changeovers
  • layout
  • work standards
  • micro-stops
  • shift plan
  • in-line quality

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Sports physiotherapist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Injury, the test and the note.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Pitch, the move and the one who lies about pain.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Gym, the load and not rushing.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Sunday, the coach and not yielding.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The press, the rumour and not leaking.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
If they play Sunday, sign it. And not burning them.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • return to play
  • injury notes
  • gym load
  • sport-specific move
  • Sunday clearance
  • the coach
  • not yield
  • not leak

Sources for this job· O*NET 29-1123.00· ESCO/ISCO 2264

Analyse my job

Jobs with similar scores

  1. 238Biomedical engineer25%
  2. 239Civil engineer25%
  3. 240Petroleum engineer25%
  4. 242Robotics engineer25%
  5. 243Telecom engineer25%
  6. 244Electrical engineer25%