Automation index
How much of a Production engineer’s job can AI already do?
An OEE and a sequencer come earlier. Getting the shift out without stopping the line for nothing do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Production engineer
25%
AI can already do 25% of this job.
#233 / 633
View rankingProduction engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
OEE, sequence and the shift plan.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Line, changeovers and the micro-stop.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Layout, times and the work standard.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Supervisors, unions and the shift that turns.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
In-line quality and the batch that cannot ship.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Hit the plan, and not dressing the OEE.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- OEE
- sequence production
- changeovers
- layout
- work standards
- micro-stops
- shift plan
- in-line quality
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Tractor driver
19%
#544 / 633
View rankingTractor driver
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Field, implements and the day’s log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Plough, sow and the GPS that drops.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Irrigation, the pipe and not running a wheel over.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Maintenance, grease and the implement that breaks.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The rain, the mud and not sinking the field.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
A straight furrow, and not running over the irrigation.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- plough
- sow
- implements
- farm GPS
- fields
- grease the tractor
- pipe irrigation
- mud
Sources for this job· O*NET 45-2091.00· ESCO/ISCO 8341