Automation index
How much of a Production engineer’s job can AI already do?
An OEE and a sequencer come earlier. Getting the shift out without stopping the line for nothing do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Production engineer
25%
AI can already do 25% of this job.
#233 / 633
View rankingProduction engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
OEE, sequence and the shift plan.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Line, changeovers and the micro-stop.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Layout, times and the work standard.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Supervisors, unions and the shift that turns.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
In-line quality and the batch that cannot ship.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Hit the plan, and not dressing the OEE.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- OEE
- sequence production
- changeovers
- layout
- work standards
- micro-stops
- shift plan
- in-line quality
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Urologist
21%
#441 / 633
View rankingUrologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read scans, PSA and a first plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Clinic, exam and urological endoscopy.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Prostate, stone and bladder surgery.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 10% | +1.8 |
Explain, consent and oncology follow-up.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Reports, prescriptions and day-case theatre.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
On-call, colic and liability for the act.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Read scans, PSA and a first plan
- Clinic, exam and urological endoscopy
- Prostate, stone and bladder surgery
- Explain, consent and oncology follow-up
- On-call, colic and liability for the act
- urologo
- urologist
Sources for this job· O*NET 29-1229.00· ESCO/ISCO 2212