IS WORK OVER?

Automation index

How much of a Production engineer’s job can AI already do?

An OEE and a sequencer come earlier. Getting the shift out without stopping the line for nothing do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Production engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
OEE, sequence and the shift plan.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Line, changeovers and the micro-stop.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Layout, times and the work standard.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Supervisors, unions and the shift that turns.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
In-line quality and the batch that cannot ship.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Hit the plan, and not dressing the OEE.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • OEE
  • sequence production
  • changeovers
  • layout
  • work standards
  • micro-stops
  • shift plan
  • in-line quality

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Well driller

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Location, permit and the progress log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drill, case and the collapse.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Mud, samples and the geological log.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Yield test, pump and the water analysis.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The owner, the neighbour and the well that will not yield.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Clean water, and not leaving a blind well.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drill wells
  • case
  • yield test
  • drilling mud
  • geological log
  • samples
  • well pumps
  • drilling permits

Sources for this job· O*NET 47-5023.00· ESCO/ISCO 8113

Analyse my job

Jobs with similar scores

  1. 230Biomedical engineer25%
  2. 231Civil engineer25%
  3. 232Petroleum engineer25%
  4. 234Robotics engineer25%
  5. 235Telecom engineer25%
  6. 236Electrical engineer25%