Automation index
How much of a Production engineer’s job can AI already do?
An OEE and a sequencer come earlier. Getting the shift out without stopping the line for nothing do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Production engineer
25%
AI can already do 25% of this job.
#233 / 623
View rankingProduction engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
OEE, sequence and the shift plan.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Line, changeovers and the micro-stop.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Layout, times and the work standard.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Supervisors, unions and the shift that turns.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
In-line quality and the batch that cannot ship.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Hit the plan, and not dressing the OEE.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- OEE
- sequence production
- changeovers
- layout
- work standards
- micro-stops
- shift plan
- in-line quality
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Winemaker
25%
#223 / 623
View rankingWinemaker
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Lab work, densities and fermentation control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Tasting, blending and the call on the vintage.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Vineyard, ripeness and when to pick.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 22% | +4 |
Ageing, barrel, filtration and bottling.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Cellar, records and the board’s visit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Signing the vintage and owning the bottle.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- make wine
- taste musts
- blend wines
- control fermentation
- decide harvest
- age in barrel
- bottle
- sign the vintage
Sources for this job· O*NET 19-1012.00· ESCO/ISCO 2145