IS WORK OVER?

Automation index

How much of a Prompt engineer’s job can AI already do?

A prompt and an eval come earlier. Knowing when the model lies, and what must not be automated, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Prompt engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Design prompts, tools and chains.
Estimate

No public source provides a precise figure. This is our estimate.

24%58%+13.9
Evals, datasets and regressions.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Integrate with product and safety limits.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Talk to the business about a good output.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Watch hallucinations, bias and cost.
Estimate

No public source provides a precise figure. This is our estimate.

14%20%+2.8
Decide what the model gets, and what it does not.
Estimate

No public source provides a precise figure. This is our estimate.

12%16%+1.9
Total100%34%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Design prompts, tools and chains
  • Evals, datasets and regressions
  • Integrate with product and safety limits
  • Talk to the business about a good output
  • Watch hallucinations, bias and cost
  • prompt engineer
  • ingeniero de prompts
  • llm engineer

Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2512

Aerial technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Bookings, levels and install logs.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Roof, mast, cable and outlet.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Configure, tune and explain to the neighbour.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Community, porter and access.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Faults, building ICT and fibre.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Not falling and not leaving a building without the match.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Bookings, levels and install logs
  • Roof, mast, cable and outlet
  • Community, porter and access
  • Faults, building ICT and fibre
  • antenista
  • instalador de antenas
  • aerial technician

Sources for this job· O*NET 49-2022.00· ESCO/ISCO 7422

Analyse my job

Jobs with similar scores

  1. 18BI analyst34%
  2. 19Executive assistant34%
  3. 20Procurement specialist34%
  4. 22Video producer34%
  5. 23Insurance agent33%
  6. 24Warehouse operator33%