Automation index
How much of a Prompt engineer’s job can AI already do?
A prompt and an eval come earlier. Knowing when the model lies, and what must not be automated, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Prompt engineer
34%
AI can already do 34% of this job.
#21 / 713
View rankingPrompt engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Design prompts, tools and chains.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 58% | +13.9 |
Evals, datasets and regressions.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Integrate with product and safety limits.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Talk to the business about a good output.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Watch hallucinations, bias and cost.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 20% | +2.8 |
Decide what the model gets, and what it does not.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 16% | +1.9 |
| Total | 100% | 34% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Design prompts, tools and chains
- Evals, datasets and regressions
- Integrate with product and safety limits
- Talk to the business about a good output
- Watch hallucinations, bias and cost
- prompt engineer
- ingeniero de prompts
- llm engineer
Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2512
IS WORK OVER?
Army officer
22%
#402 / 713
View rankingArmy officer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Order, the map and the section.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the one who lags and the one who jumps.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Live fire, safety and not playing brave.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Logistics, the meal and the one that does not arrive.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Command, the pressure and not dressing casualties.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Get them all out, and not losing one.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- operations orders
- sections
- the map
- live fire
- meals
- casualties
- command
- field safety
Sources for this job· O*NET 55-1015.00· ESCO/ISCO 0110