Automation index
How much of a Prompt engineer’s job can AI already do?
A prompt and an eval come earlier. Knowing when the model lies, and what must not be automated, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Prompt engineer
34%
AI can already do 34% of this job.
#21 / 623
View rankingPrompt engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Design prompts, tools and chains.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 58% | +13.9 |
Evals, datasets and regressions.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Integrate with product and safety limits.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Talk to the business about a good output.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Watch hallucinations, bias and cost.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 20% | +2.8 |
Decide what the model gets, and what it does not.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 16% | +1.9 |
| Total | 100% | 34% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Design prompts, tools and chains
- Evals, datasets and regressions
- Integrate with product and safety limits
- Talk to the business about a good output
- Watch hallucinations, bias and cost
- prompt engineer
- ingeniero de prompts
- llm engineer
Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2512
IS WORK OVER?
BIM modeller
28%
#109 / 623
View rankingBIM modeller
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, families and clash detection.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
IFC, BEP and trade coordination.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Site, the one who will not open the model, and the meeting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Quantities, parameters and the 4D nobody uses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The last-minute change and not breaking the federated model.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it can be built, and not over-modelling.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- BIM modelling
- clash detection
- Revit families
- IFC
- BEP
- coordinate trades
- BIM quantities
- federated model
Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3118