IS WORK OVER?

Automation index

How much of a Prompt engineer’s job can AI already do?

A prompt and an eval come earlier. Knowing when the model lies, and what must not be automated, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Prompt engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Design prompts, tools and chains.
Estimate

No public source provides a precise figure. This is our estimate.

24%58%+13.9
Evals, datasets and regressions.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Integrate with product and safety limits.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Talk to the business about a good output.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Watch hallucinations, bias and cost.
Estimate

No public source provides a precise figure. This is our estimate.

14%20%+2.8
Decide what the model gets, and what it does not.
Estimate

No public source provides a precise figure. This is our estimate.

12%16%+1.9
Total100%34%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Design prompts, tools and chains
  • Evals, datasets and regressions
  • Integrate with product and safety limits
  • Talk to the business about a good output
  • Watch hallucinations, bias and cost
  • prompt engineer
  • ingeniero de prompts
  • llm engineer

Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2512

Furniture assembler

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Manual, fittings and the parts count.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Assemble, plumb and the wrong screw.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Up the stairs without marking the wall.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Adjust doors, drawers and the client watching.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The small flat and the piece that will not fit whole.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it does not wobble, and not leaving a fitting out.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • assemble furniture
  • fittings
  • plumb wardrobes
  • adjust doors
  • drawers
  • up the stairs
  • parts count
  • screws

Sources for this job· O*NET 51-2092.00· ESCO/ISCO 8219

Analyse my job

Jobs with similar scores

  1. 18BI analyst34%
  2. 19Executive assistant34%
  3. 20Procurement specialist34%
  4. 22Video producer34%
  5. 23Insurance agent33%
  6. 24Warehouse operator33%