Automation index
How much of a Prompt engineer’s job can AI already do?
A prompt and an eval come earlier. Knowing when the model lies, and what must not be automated, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Prompt engineer
34%
AI can already do 34% of this job.
#21 / 623
View rankingPrompt engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Design prompts, tools and chains.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 58% | +13.9 |
Evals, datasets and regressions.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Integrate with product and safety limits.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Talk to the business about a good output.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Watch hallucinations, bias and cost.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 20% | +2.8 |
Decide what the model gets, and what it does not.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 16% | +1.9 |
| Total | 100% | 34% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Design prompts, tools and chains
- Evals, datasets and regressions
- Integrate with product and safety limits
- Talk to the business about a good output
- Watch hallucinations, bias and cost
- prompt engineer
- ingeniero de prompts
- llm engineer
Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2512
IS WORK OVER?
Geologist
23%
#296 / 623
View rankingGeologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Maps, sections and a first report.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 42% | +8.4 |
Process boreholes, GIS and lab.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 35% | +5.6 |
Field camp, outcrop and sampling.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 12% | +2.4 |
Read hazard, water and deposit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Talk to works, mine or government.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
Sign the opinion and own the real ground.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
| Total | 100% | 23% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Maps, sections and a first report
- Process boreholes, GIS and lab
- Field camp, outcrop and sampling
- Read hazard, water and deposit
- Talk to works, mine or government
- Sign the opinion and own the real ground
- geologo
- geologist
Sources for this job· O*NET 19-2042.00· ESCO/ISCO 2114