IS WORK OVER?

Automation index

How much of a Prompt engineer’s job can AI already do?

A prompt and an eval come earlier. Knowing when the model lies, and what must not be automated, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Prompt engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Design prompts, tools and chains.
Estimate

No public source provides a precise figure. This is our estimate.

24%58%+13.9
Evals, datasets and regressions.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Integrate with product and safety limits.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Talk to the business about a good output.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Watch hallucinations, bias and cost.
Estimate

No public source provides a precise figure. This is our estimate.

14%20%+2.8
Decide what the model gets, and what it does not.
Estimate

No public source provides a precise figure. This is our estimate.

12%16%+1.9
Total100%34%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Design prompts, tools and chains
  • Evals, datasets and regressions
  • Integrate with product and safety limits
  • Talk to the business about a good output
  • Watch hallucinations, bias and cost
  • prompt engineer
  • ingeniero de prompts
  • llm engineer

Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2512

Surveyor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Process stations, GNSS and drawings.
Estimate

No public source provides a precise figure. This is our estimate.

20%45%+9
Reports, volumes and deliverables.
Estimate

No public source provides a precise figure. This is our estimate.

16%35%+5.6
Measure in the field, stake and set out.
Estimate

No public source provides a precise figure. This is our estimate.

20%12%+2.4
Coordinate with works and the site authority.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Read the ground when the model lies.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Owning a 3 cm error.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Process stations, GNSS and drawings
  • Reports, volumes and deliverables
  • Measure in the field, stake and set out
  • Read the ground when the model lies
  • Owning a 3 cm error
  • topografo
  • surveyor
  • aparejador topografia

Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165

Analyse my job

Jobs with similar scores

  1. 18BI analyst34%
  2. 19Executive assistant34%
  3. 20Procurement specialist34%
  4. 22Video producer34%
  5. 23Insurance agent33%
  6. 24Warehouse operator33%