Automation index
How much of a Props master’s job can AI already do?
A props list comes earlier. The object being there, working and not breaking on stage do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Props master
19%
AI can already do 19% of this job.
#488 / 643
View rankingProps master
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
List, references and the budget.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Make, adapt and the one that will not fit the hand.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Rehearsal, the change and the one that vanishes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Show, tables and the preset.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The actor, the whim and not improvising the weapon.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it is there, and not breaking on stage.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- props lists
- presets
- adapt objects
- props rehearsals
- show tables
- stage weapons
- references
- props budget
Sources for this job· O*NET 27-1027.00· ESCO/ISCO 3435
IS WORK OVER?
Mason
15%
#627 / 643
View rankingMason
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read drawings, measure and order material.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 30% | +4.8 |
Setting out and levels on site.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Raise walls, render and plaster.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Floors, tiling and finishing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Safety, scaffolding and clearing the bay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 10% | +1.6 |
Coordinate with foreman, plumber and electrician.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
| Total | 100% | 15% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- build walls
- plaster
- site work
- Read drawings, measure and order material
- Setting out and levels on site
- Raise walls, render and plaster
- Floors, tiling and finishing
- Safety, scaffolding and clearing the bay
- albanil
- mason
Sources for this job· O*NET 47-2021.00· ESCO/ISCO 7112