Automation index
How much of a Prosecutor’s job can AI already do?
An indictment can be sketched. Deciding to drop a case, accusing in court, and owning it cannot.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Prosecutor
22%
AI can already do 22% of this job.
#375 / 733
View rankingProsecutor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Study the file and draft the indictment.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 40% | +8.8 |
Search case law and legally qualify the facts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 35% | +5.6 |
Coordinate with detectives and experts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Appear at trial and examine witnesses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Negotiate pleas and precautionary measures.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 10% | +1.6 |
Decide to drop, charge, or appeal.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 8% | +1.1 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Study the file and draft the indictment
- Coordinate with detectives and experts
- Appear at trial and examine witnesses
- Negotiate pleas and precautionary measures
- Decide to drop, charge, or appeal
- fiscal
- prosecutor
- ministerio publico
Sources for this job· O*NET 23-1022.00· ESCO/ISCO 2611
IS WORK OVER?
Railway engineer
22%
#389 / 733
View rankingRailway engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Track, geometry and the study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Points, the blade and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
OLE, the height and the gauge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the possession and not leaving the wire wrong.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not derail, and not signing half-done points.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- track geometry
- points
- OLE
- gauge
- possessions
- blades
- railway studies
- not jump to a yes
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142