Automation index
How much of a Quality engineer’s job can AI already do?
An FMEA and an 8D come earlier. Stopping the supplier and deciding if the batch travels do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Quality engineer
29%
AI can already do 29% of this job.
#63 / 623
View rankingQuality engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
FMEA, control plan and the limits.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
8D, claims and the supplier.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Audit, IATF and the awkward finding.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The line, the defect and stop or not.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
APQP, PPAP and the customer launch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Release with judgement, and not hiding the PPM.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- FMEA
- 8D
- control plan
- IATF
- PPAP
- APQP
- supplier claims
- release batches
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
3D animator
30%
#45 / 623
View ranking3D animator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Blocking, layouts and previews.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 52% | +11.4 |
Simple rigs, cycles and technical cleanup.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 45% | +8.1 |
Spline, weight and character acting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 20% | +3.2 |
Director and supervisor notes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Integrate with lighting, fx and editorial.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Taste: which shot lives and which dies.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
| Total | 100% | 30% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Blocking, layouts and previews
- Simple rigs, cycles and technical cleanup
- Spline, weight and character acting
- Director and supervisor notes
- Integrate with lighting, fx and editorial
- Taste: which shot lives and which dies
- animador 3d
- 3d animator
- motion graphics
Sources for this job· O*NET 27-1014.00· ESCO/ISCO 2166