IS WORK OVER?

Automation index

How much of a Quality engineer’s job can AI already do?

An FMEA and an 8D come earlier. Stopping the supplier and deciding if the batch travels do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Quality engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
FMEA, control plan and the limits.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
8D, claims and the supplier.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Audit, IATF and the awkward finding.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The line, the defect and stop or not.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
APQP, PPAP and the customer launch.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Release with judgement, and not hiding the PPM.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • FMEA
  • 8D
  • control plan
  • IATF
  • PPAP
  • APQP
  • supplier claims
  • release batches

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Chimney sweep

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Inspection, camera and the flue report.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Climb, sweep and the nest that blocks.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Tightness, draught and the one that will not draw.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Certificate, rules and the residents.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The wet roof and not falling.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Clean for real, and not leaving loose soot.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • sweep chimneys
  • flue camera
  • draught
  • flue certificate
  • nests
  • roofs
  • tightness
  • soot

Sources for this job· O*NET 47-4071.00· ESCO/ISCO 7133

Analyse my job

Jobs with similar scores

  1. 60Risk manager29%
  2. 61Court case manager29%
  3. 62Labour consultant29%
  4. 64ML engineer29%
  5. 65Occupational physician29%
  6. 66Career counsellor29%