Automation index
How much of a Quality engineer’s job can AI already do?
An FMEA and an 8D come earlier. Stopping the supplier and deciding if the batch travels do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Quality engineer
29%
AI can already do 29% of this job.
#63 / 623
View rankingQuality engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
FMEA, control plan and the limits.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
8D, claims and the supplier.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Audit, IATF and the awkward finding.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The line, the defect and stop or not.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
APQP, PPAP and the customer launch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Release with judgement, and not hiding the PPM.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- FMEA
- 8D
- control plan
- IATF
- PPAP
- APQP
- supplier claims
- release batches
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Costume designer
22%
#333 / 623
View rankingCostume designer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
The reading, sketch and the palette.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Shop, fitting and the one you cannot sit in.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Rehearsal, quick change and the one that catches.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Budget, dyes and the one that is late.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Direction, the ego and not dressing against the text.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That you can act, and not splitting on the third.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- costume sketches
- costume fittings
- quick changes
- palette
- wardrobe shop
- dyes
- rehearsals
- costume budget
Sources for this job· O*NET 27-1022.00· ESCO/ISCO 2163