IS WORK OVER?

Automation index

How much of a Quality engineer’s job can AI already do?

An FMEA and an 8D come earlier. Stopping the supplier and deciding if the batch travels do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Quality engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
FMEA, control plan and the limits.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
8D, claims and the supplier.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Audit, IATF and the awkward finding.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The line, the defect and stop or not.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
APQP, PPAP and the customer launch.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Release with judgement, and not hiding the PPM.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • FMEA
  • 8D
  • control plan
  • IATF
  • PPAP
  • APQP
  • supplier claims
  • release batches

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Geologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Maps, sections and a first report.
Estimate

No public source provides a precise figure. This is our estimate.

20%42%+8.4
Process boreholes, GIS and lab.
Estimate

No public source provides a precise figure. This is our estimate.

16%35%+5.6
Field camp, outcrop and sampling.
Estimate

No public source provides a precise figure. This is our estimate.

20%12%+2.4
Read hazard, water and deposit.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Talk to works, mine or government.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Sign the opinion and own the real ground.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%23%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Maps, sections and a first report
  • Process boreholes, GIS and lab
  • Field camp, outcrop and sampling
  • Read hazard, water and deposit
  • Talk to works, mine or government
  • Sign the opinion and own the real ground
  • geologo
  • geologist

Sources for this job· O*NET 19-2042.00· ESCO/ISCO 2114

Analyse my job

Jobs with similar scores

  1. 60Risk manager29%
  2. 61Court case manager29%
  3. 62Labour consultant29%
  4. 64ML engineer29%
  5. 65Occupational physician29%
  6. 66Career counsellor29%