Automation index
How much of a Quality engineer’s job can AI already do?
An FMEA and an 8D come earlier. Stopping the supplier and deciding if the batch travels do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Quality engineer
29%
AI can already do 29% of this job.
#63 / 743
View rankingQuality engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
FMEA, control plan and the limits.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
8D, claims and the supplier.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Audit, IATF and the awkward finding.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The line, the defect and stop or not.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
APQP, PPAP and the customer launch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Release with judgement, and not hiding the PPM.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- FMEA
- 8D
- control plan
- IATF
- PPAP
- APQP
- supplier claims
- release batches
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Site engineer
19%
#598 / 743
View rankingSite engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Setting-out, axes and the level.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Rebar, cover and the one that is missing.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Concrete, the slump and not pouring if it fails.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Note, the diary and not dressing the delay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The site manager, the rush and not covering bad steel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That the column is there, and not covering the steel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- setting-out
- axes
- rebar
- cover
- slump
- site diary
- levels
- not cover steel
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142