IS WORK OVER?

Automation index

How much of a Quality engineer’s job can AI already do?

An FMEA and an 8D come earlier. Stopping the supplier and deciding if the batch travels do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Quality engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
FMEA, control plan and the limits.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
8D, claims and the supplier.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Audit, IATF and the awkward finding.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The line, the defect and stop or not.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
APQP, PPAP and the customer launch.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Release with judgement, and not hiding the PPM.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • FMEA
  • 8D
  • control plan
  • IATF
  • PPAP
  • APQP
  • supplier claims
  • release batches

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Translator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Follow ethical codes that protect the confidentiality of information.
Estimate

No public source provides a precise figure. This is our estimate.

15%28%+4.2
Translate messages simultaneously or consecutively into specified languages, orally or by using hand signs, maintaining message content, context, and style as much as possible.
Public

WMT 2024

See evidence

14%72%+10.1
Listen to speakers' statements to determine meanings and to prepare translations, using electronic listening systems as necessary.
Public

WMT 2024

See evidence

11%72%+7.9
Identify and resolve conflicts related to the meanings of words, concepts, practices, or behaviors.
Estimate

No public source provides a precise figure. This is our estimate.

10%28%+2.8
Check translations of technical terms and terminology to ensure that they are accurate and remain consistent throughout translation revisions.
Public

WMT 2024

See evidence

8%72%+5.8
Refer to reference materials, such as dictionaries, lexicons, encyclopedias, and computerized terminology banks, as needed to ensure translation accuracy.
Public

WMT 2024

See evidence

7%72%+5
Compile information on content and context of information to be translated and on intended audience.
Public

WMT 2024

See evidence

7%72%+5
Adapt translations to students' cognitive and grade levels, collaborating with educational team members as necessary.
Public

WMT 2024

See evidence

7%72%+5
Other less frequent tasks (weight estimated from frequency).
Estimate

No public source provides a precise figure. This is our estimate.

21%28%+5.9
Total100%52%

Modelled workweek: 100% · Public evidence: 54% · Estimate: 46% · Confidence: Medium

Skills and activities

  • translate texts
  • interpret
  • proofread translations
  • information confidentiality
  • spelling
  • office software
  • grammar
  • speak different languages
  • master language rules
  • develop a translation strategy

Sources for this job· O*NET 27-3091.00· ESCO/ISCO 2643

Analyse my job

Jobs with similar scores

  1. 60Risk manager29%
  2. 61Court case manager29%
  3. 62Labour consultant29%
  4. 64ML engineer29%
  5. 65Occupational physician29%
  6. 66Career counsellor29%