Automation index
How much of a Quality engineer’s job can AI already do?
An FMEA and an 8D come earlier. Stopping the supplier and deciding if the batch travels do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Quality engineer
29%
AI can already do 29% of this job.
#63 / 623
View rankingQuality engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
FMEA, control plan and the limits.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
8D, claims and the supplier.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Audit, IATF and the awkward finding.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The line, the defect and stop or not.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
APQP, PPAP and the customer launch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Release with judgement, and not hiding the PPM.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- FMEA
- 8D
- control plan
- IATF
- PPAP
- APQP
- supplier claims
- release batches
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Warehouse supervisor
24%
#270 / 623
View rankingWarehouse supervisor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Docks, waves and the shift plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
The team, the peak and the one who cannot keep up.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Stock, shrink and the mystery gap.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Safety, forklifts and the near miss.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The late haulier and not mixing the docks.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Get the shift out, and not mixing the goods.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- plan docks
- waves
- warehouse shift
- shrink
- forklifts
- near misses
- outbound peaks
- mixed goods
Sources for this job· O*NET 53-1048.00· ESCO/ISCO 1324