IS WORK OVER?

Automation index

How much of a Quality technician’s job can AI already do?

A statistical check and an 8D come earlier. Stopping the line and deciding if the batch ships do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Quality technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Inspection, measurements and statistical control.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Nonconformities, 8D and corrective actions.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Stop the line, sample and decide the batch.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Internal audits, ISO and traceability.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Suppliers, incoming goods and complaints.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Release judgement and liability for the batch.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • quality control
  • measure parts
  • release batches
  • raise nonconformities
  • run 8D
  • audit ISO
  • sample production
  • stop the line

Sources for this job· O*NET 51-9061.00· ESCO/ISCO 7543

Aerospace technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Bench, the protocol and the torque.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Part, the lockwire and the one left loose.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
NDT, the crack and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Engine, the run and the one that does not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The engineer, the rush and not signing half done.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Torque it, and not leaving the lockwire loose.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • test bench
  • torque
  • lockwire
  • aerospace NDT
  • engine runs
  • protocols
  • cracks
  • not sign half done

Sources for this job· O*NET 17-3021.00· ESCO/ISCO 3115

Analyse my job

Jobs with similar scores

  1. 68Insurance claims adjuster29%
  2. 69Commercial registrar29%
  3. 70PR specialist29%
  4. 72Equality officer29%
  5. 73Health and safety officer29%
  6. 74Social worker29%