Automation index
How much of a Quality technician’s job can AI already do?
A statistical check and an 8D come earlier. Stopping the line and deciding if the batch ships do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Quality technician
29%
AI can already do 29% of this job.
#71 / 623
View rankingQuality technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Inspection, measurements and statistical control.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Nonconformities, 8D and corrective actions.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Stop the line, sample and decide the batch.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Internal audits, ISO and traceability.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Suppliers, incoming goods and complaints.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Release judgement and liability for the batch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- quality control
- measure parts
- release batches
- raise nonconformities
- run 8D
- audit ISO
- sample production
- stop the line
Sources for this job· O*NET 51-9061.00· ESCO/ISCO 7543
IS WORK OVER?
Cloud architect
28%
#82 / 623
View rankingCloud architect
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Diagrams, ADRs and a first IaC pass.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 48% | +10.6 |
Cost estimate, Well-Architected and gaps.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Review PRs, security and network.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 20% | +3.2 |
Align with security, finops and product.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
PoCs, real failures and vendor limits.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Sign the design and own the incident.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- building plans
- renders
- sign a project
- Diagrams, ADRs and a first IaC pass
- Cost estimate, Well-Architected and gaps
- Review PRs, security and network
- Align with security, finops and product
- PoCs, real failures and vendor limits
- Sign the design and own the incident
- arquitecto cloud
Sources for this job· O*NET 15-1243.01· ESCO/ISCO 2511