Automation index
How much of a Quality technician’s job can AI already do?
A statistical check and an 8D come earlier. Stopping the line and deciding if the batch ships do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Quality technician
29%
AI can already do 29% of this job.
#71 / 623
View rankingQuality technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Inspection, measurements and statistical control.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Nonconformities, 8D and corrective actions.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Stop the line, sample and decide the batch.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Internal audits, ISO and traceability.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Suppliers, incoming goods and complaints.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Release judgement and liability for the batch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- quality control
- measure parts
- release batches
- raise nonconformities
- run 8D
- audit ISO
- sample production
- stop the line
Sources for this job· O*NET 51-9061.00· ESCO/ISCO 7543
IS WORK OVER?
Operating room nurse
20%
#446 / 623
View rankingOperating room nurse
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Set the table, checklist and the patient card.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Scrub, anticipate and not break the field.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Count swabs, needles and the record.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Circulate, stocks and the turnaround.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Emergency, the bleeder and the table change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Nothing left inside and signing the count.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- scrub
- surgical checklist
- swab count
- set the table
- circulate
- sterile field
- theatre
- anticipate the surgeon
Sources for this job· O*NET 29-1141.00· ESCO/ISCO 2221