IS WORK OVER?

Automation index

How much of a Quality technician’s job can AI already do?

A statistical check and an 8D come earlier. Stopping the line and deciding if the batch ships do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Quality technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Inspection, measurements and statistical control.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Nonconformities, 8D and corrective actions.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Stop the line, sample and decide the batch.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Internal audits, ISO and traceability.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Suppliers, incoming goods and complaints.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Release judgement and liability for the batch.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • quality control
  • measure parts
  • release batches
  • raise nonconformities
  • run 8D
  • audit ISO
  • sample production
  • stop the line

Sources for this job· O*NET 51-9061.00· ESCO/ISCO 7543

Wind-turbine technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
SCADA, the code and the spare.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Climb, the wind and the one who is sick.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Nacelle, the oil and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Rescue, the protocol and not improvising.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The storm, the access and aborting.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Come down whole, and the turbine running.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • farm SCADA
  • climb the tower
  • nacelle
  • height rescue
  • oils
  • fault codes
  • access
  • wind

Sources for this job· O*NET 49-9081.00· ESCO/ISCO 7412

Analyse my job

Jobs with similar scores

  1. 68Insurance claims adjuster29%
  2. 69Commercial registrar29%
  3. 70PR specialist29%
  4. 72Equality officer29%
  5. 73Health and safety officer29%
  6. 74Social worker29%