Automation index
How much of a Radiation oncologist’s job can AI already do?
Assisted contouring comes earlier. Setting the field and not burning healthy tissue do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Radiation oncologist
23%
AI can already do 23% of this job.
#347 / 743
View rankingRadiation oncologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Contouring, fractions and the dose plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 48% | +7.7 |
Clinic, the tumour and what can be irradiated.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Simulation, immobilisation and the machine day.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Side effects, pauses and the patient who cannot take it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Board, the surgeon and the medical oncologist.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Signing the plan and the dose that does not erase.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 23% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- contouring
- plan radiotherapy
- dosimetry
- RT simulation
- fractions
- tumour board
- radiation effects
- immobilise the patient
Sources for this job· O*NET 29-1224.00· ESCO/ISCO 2212
IS WORK OVER?
Corrosion engineer
22%
#387 / 743
View rankingCorrosion engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Thicknesses, the map and the coupon.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Plant, the pipe and the one that is thin.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Cathode, the protection and the one that will not take.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Shutdown, the coating and not painting over rust.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Operations, the rush and not leaving the thin one in service.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Stop before it goes, and not painting over it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- thicknesses
- corrosion maps
- cathodic protection
- coatings
- thin pipes
- shutdowns
- rust
- coupons
Sources for this job· O*NET 17-2131.00· ESCO/ISCO 2145