Automation index
How much of a Radiation oncologist’s job can AI already do?
Assisted contouring comes earlier. Setting the field and not burning healthy tissue do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Radiation oncologist
23%
AI can already do 23% of this job.
#311 / 633
View rankingRadiation oncologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Contouring, fractions and the dose plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 48% | +7.7 |
Clinic, the tumour and what can be irradiated.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Simulation, immobilisation and the machine day.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Side effects, pauses and the patient who cannot take it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Board, the surgeon and the medical oncologist.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Signing the plan and the dose that does not erase.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 23% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- contouring
- plan radiotherapy
- dosimetry
- RT simulation
- fractions
- tumour board
- radiation effects
- immobilise the patient
Sources for this job· O*NET 29-1224.00· ESCO/ISCO 2212
IS WORK OVER?
Production engineer
25%
#233 / 633
View rankingProduction engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
OEE, sequence and the shift plan.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Line, changeovers and the micro-stop.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Layout, times and the work standard.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Supervisors, unions and the shift that turns.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
In-line quality and the batch that cannot ship.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Hit the plan, and not dressing the OEE.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- OEE
- sequence production
- changeovers
- layout
- work standards
- micro-stops
- shift plan
- in-line quality
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141