Automation index
How much of a Radiation therapist’s job can AI already do?
Guided set-up comes earlier. Immobilising every day and not missing the field do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Radiation therapist
24%
AI can already do 24% of this job.
#319 / 743
View rankingRadiation therapist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plan, IGRT and the day’s set-up.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Immobilise, tattoo and treat fraction by fraction.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 12% | +2.6 |
Check images, shifts and call the physician.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Side effects, the patient who cries and the wait.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Machine QA and alarms.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Today’s dose and not irradiating the wrong thing.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- set up for RT
- IGRT
- immobilise patients
- deliver fractions
- linac QA
- reference tattoos
- shifts
- radiotherapy
Sources for this job· O*NET 29-1124.00· ESCO/ISCO 3211
IS WORK OVER?
Site engineer
19%
#598 / 743
View rankingSite engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Setting-out, axes and the level.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Rebar, cover and the one that is missing.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Concrete, the slump and not pouring if it fails.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Note, the diary and not dressing the delay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The site manager, the rush and not covering bad steel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That the column is there, and not covering the steel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- setting-out
- axes
- rebar
- cover
- slump
- site diary
- levels
- not cover steel
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142