Automation index
How much of a Radio host’s job can AI already do?
A rundown and a clip come earlier. Filling the air when the line drops does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Radio host
22%
AI can already do 22% of this job.
#347 / 633
View rankingRadio host
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Rundown, clips and a first script.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
On air, interviews and a silence that weighs.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 12% | +2.4 |
Guests, producer and real time.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Edit, podcast and the show’s socials.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Voice, shifts and not going blank.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not saying something you cannot take back.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Rundown, clips and a first script
- Guests, producer and real time
- Edit, podcast and the show’s socials
- Voice, shifts and not going blank
- Not saying something you cannot take back
- locutor
- locutora
- radio host
Sources for this job· O*NET 27-3011.00· ESCO/ISCO 2656
IS WORK OVER?
Industrial engineer
28%
#102 / 633
View rankingIndustrial engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model processes, balances and a first plant layout.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 45% | +9.9 |
Draft procedures, PFDs and operating instructions.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Analyse cost, bottlenecks and OEE from data.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Coordinate suppliers, maintenance and production.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Commissioning and plant trials.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Capex calls and industrial-safety liability.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Commissioning and plant trials
- ingeniero industrial
- industrial engineer
- procesos industriales
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141