Automation index
How much of a Radio host’s job can AI already do?
A rundown and a clip come earlier. Filling the air when the line drops does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Radio host
22%
AI can already do 22% of this job.
#347 / 633
View rankingRadio host
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Rundown, clips and a first script.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
On air, interviews and a silence that weighs.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 12% | +2.4 |
Guests, producer and real time.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Edit, podcast and the show’s socials.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Voice, shifts and not going blank.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not saying something you cannot take back.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Rundown, clips and a first script
- Guests, producer and real time
- Edit, podcast and the show’s socials
- Voice, shifts and not going blank
- Not saying something you cannot take back
- locutor
- locutora
- radio host
Sources for this job· O*NET 27-3011.00· ESCO/ISCO 2656
IS WORK OVER?
Tower crane operator
18%
#573 / 633
View rankingTower crane operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Radius, winds and the day’s log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Hoist, trolley and the slinger’s call.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Erect, climb and the base that is checked.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Two-crane lifts and crossing jibs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The wind that gets up and stopping in time.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Sweep nobody, and not pushing the radius.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tower-crane lifts
- load charts
- climb the crane
- slinger’s call
- jib wind
- crossing jibs
- crane base
- trolley
Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343