Automation index
How much of a Radio host’s job can AI already do?
A rundown and a clip come earlier. Filling the air when the line drops does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Radio host
22%
AI can already do 22% of this job.
#354 / 643
View rankingRadio host
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Rundown, clips and a first script.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
On air, interviews and a silence that weighs.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 12% | +2.4 |
Guests, producer and real time.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Edit, podcast and the show’s socials.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Voice, shifts and not going blank.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not saying something you cannot take back.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Rundown, clips and a first script
- Guests, producer and real time
- Edit, podcast and the show’s socials
- Voice, shifts and not going blank
- Not saying something you cannot take back
- locutor
- locutora
- radio host
Sources for this job· O*NET 27-3011.00· ESCO/ISCO 2656
IS WORK OVER?
Wind-turbine technician
19%
#546 / 643
View rankingWind-turbine technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
SCADA, the code and the spare.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Climb, the wind and the one who is sick.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Nacelle, the oil and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Rescue, the protocol and not improvising.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The storm, the access and aborting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Come down whole, and the turbine running.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- farm SCADA
- climb the tower
- nacelle
- height rescue
- oils
- fault codes
- access
- wind
Sources for this job· O*NET 49-9081.00· ESCO/ISCO 7412