IS WORK OVER?

Automation index

How much of a Railway engineer’s job can AI already do?

A track study comes earlier. The train not derailing without signing a half-done set of points do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Railway engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Track, geometry and the study.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Points, the blade and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
OLE, the height and the gauge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the possession and not leaving the wire wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not derail, and not signing half-done points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • track geometry
  • points
  • OLE
  • gauge
  • possessions
  • blades
  • railway studies
  • not jump to a yes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Bridge engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, loads and the span.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Works, the prestress and the one who did not tension.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Inspection, the crack and not looking away.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Traffic, the closure and not leaving the village hanging.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it takes the lorry, and not signing the crack.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • spans
  • prestress
  • cracks
  • bridge inspection
  • loads
  • traffic closures
  • structural models
  • tensioning

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 386Bridge engineer22%
  2. 387Commissioning engineer22%
  3. 388Safety engineer22%
  4. 390Forestry engineer22%
  5. 391Geotechnical engineer22%
  6. 392Welding inspector22%