IS WORK OVER?

Automation index

How much of a Railway engineer’s job can AI already do?

A track study comes earlier. The train not derailing without signing a half-done set of points do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Railway engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Track, geometry and the study.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Points, the blade and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
OLE, the height and the gauge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the possession and not leaving the wire wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not derail, and not signing half-done points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • track geometry
  • points
  • OLE
  • gauge
  • possessions
  • blades
  • railway studies
  • not jump to a yes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

District heating engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Balance, flows and the loss.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Chamber, the leak and the one that weeps.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Substation, the valve and the one that will not open.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Winter, the last block and not leaving it cold.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The council, the tariff and not hiding the loss.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the heat arrives, and not hiding the loss.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • heat balances
  • flows
  • network losses
  • chambers
  • heat substations
  • the last block
  • tariffs
  • leaks

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 400Welding engineer22%
  2. 401Power engineer22%
  3. 402Geomatics engineer22%
  4. 404Forestry engineer22%
  5. 405Geotechnical engineer22%
  6. 406Welding inspector22%